Sign In | Join Free | My himfr.com
Home > LED Stage Light >

60w 100w 200w 400w Water Effect Led Projector Light For Building Bridge Lighting

Guangzhou Dasen Lighting Corporation Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap 60w 100w 200w 400w Water Effect Led Projector Light For Building Bridge Lighting from wholesalers
     
    Buy cheap 60w 100w 200w 400w Water Effect Led Projector Light For Building Bridge Lighting from wholesalers
    • Buy cheap 60w 100w 200w 400w Water Effect Led Projector Light For Building Bridge Lighting from wholesalers
    • Buy cheap 60w 100w 200w 400w Water Effect Led Projector Light For Building Bridge Lighting from wholesalers

    60w 100w 200w 400w Water Effect Led Projector Light For Building Bridge Lighting

    Ask Lasest Price
    Brand Name : Intuiit
    Model Number : Led Water Effect Projector Light
    Certification : CE
    Supply Ability : 20000pcs/month
    Delivery Time : 15-30days
    • Product Details
    • Company Profile

    60w 100w 200w 400w Water Effect Led Projector Light For Building Bridge Lighting

    Outdoor 60w/100w/200w/400w Led Water effect projector light For Building Bridge Lighting

    Theme park lighting project
    From planning to design, from development to construction, from programming to maintenance, it was built by Dasen lighting team and was located in Huashan Town, a famous scenic spot in Yangzhou for a long time.


    Use product
    200W/400W Led gobo project light
    A total of 20 units were used


    Product introduction

    LED water effect projector with a 7-colour wheel and IP65 rating, suitable for outdoor locations. The manual and DMX-controllable dimmer, strobe, colour wheel and focus function provides full control of your visual output and effects. Dedicated IP65-rated DMX connectors for ensuring a water resistant connection are optional.


    60w 100w 200w 400w Water Effect Led Projector Light For Building Bridge Lighting

    60w 100w 200w 400w Water Effect Led Projector Light For Building Bridge Lighting


    FAQ

    Q1. Can I have a sample order for led light?
    A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable


    Q2. What about the lead time?
    A: Sample needs 5~15 days, mass production time needs 25~35days


    Q3. Do you have any MOQ limit for led light order?
    A: MOQ20 to 50, 1pc for sample checking is available

    Q4. How do you ship the goods and how long does it take to arrive?
    A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.

    Q5. How to proceed an order for led light?
    A: Firstly:let us know your requirements or application.
    Secondly:We quote according to your requirements or our suggestions.
    Thirdly:customer confirms the samples and places deposit for formal order.
    Fourthly:We arrange the production.

    Q6. Is it OK to print my logo on led light product?
    A: Yes. Please inform us formally before our production and confirm the design firstly based on our sample.

    Q7: Do you offer guarantee for the products?
    A: Yes, we offer 1, 2 , 5 year warranty to our products.

    Q8: How to deal with the faulth?
    A: Firstly:Our products are produced in strict quality control system and the defective rate will be less than 2%.
    Secondly:during the guarantee period, we will send new spare parts for replacement. For defective batch products, we can discuss with the real situation.

    Q9: Do you work a project?

    A: Sure. We have more than 50 engineers and a EPC department. We are a national high-tech enterprise which integrates with " Lighting Design, Product R&D and manufacturing, control & programming, installation, Maintenance and upgrading".

    Quality 60w 100w 200w 400w Water Effect Led Projector Light For Building Bridge Lighting for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Guangzhou Dasen Lighting Corporation Limited
    *Subject:
    *Message:
    Characters Remaining: (0/3000)